{"id":17140,"date":"2026-02-03T09:10:24","date_gmt":"2026-02-03T09:10:24","guid":{"rendered":"https:\/\/archipad.com\/?p=17140"},"modified":"2026-02-03T09:13:09","modified_gmt":"2026-02-03T09:13:09","slug":"logiciel-erp-batiment-notre-top-12-guide-pour-le-choisir-2026","status":"publish","type":"post","link":"https:\/\/archipad.com\/fr\/logiciel-erp-batiment-notre-top-12-guide-pour-le-choisir-2026\/","title":{"rendered":"Logiciel ERP b\u00e2timent : notre top 12 + guide pour le choisir &#8211; 2026"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"17140\" class=\"elementor elementor-17140\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7c055a80 e-flex e-con-boxed e-con e-parent\" data-id=\"7c055a80\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-153dd7ef elementor-widget elementor-widget-text-editor\" data-id=\"153dd7ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><\/p>\n<h2><b>Logiciel ERP b\u00e2timent : comment le choisir ?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Le choix d\u2019un logiciel ERP b\u00e2timent repose surtout sur le p\u00e9rim\u00e8tre r\u00e9el (chiffrage, achats, sous-traitance, situations), les r\u00e8gles de gestion (avancement, retenues, analytique) et la fa\u00e7on dont l\u2019outil suit une affaire du d\u00e9but \u00e0 la fin. <\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">Cet article d\u00e9finit l\u2019ERP (Enterprise Resource Planning) appliqu\u00e9 au b\u00e2timent et aux travaux publics, pr\u00e9sente les fonctionnalit\u00e9s que l\u2019on retrouve le plus souvent dans un ERP btp, puis donne des rep\u00e8res de prix par niveau. Il propose ensuite un top 12 2026\u00a0 pour situer les meilleures solutions du march\u00e9.<\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">L\u2019objectif est de faciliter la comparaison : quels crit\u00e8res v\u00e9rifier, quelles questions poser, et comment formaliser vos besoins.<\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">Commen\u00e7ons par d\u00e9finir ce qu\u2019est un logiciel ERP dans le b\u00e2timent.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Simplifiez votre gestion et fiabilisez votre suivi de chantier gr\u00e2ce au <\/span><a href=\"https:\/\/archipad.com\/fr\/fonctionnalites\/planning\/\"><span style=\"font-weight: 400;\">planning<\/span><\/a><span style=\"font-weight: 400;\"> d\u2019Archipad.<\/span><\/p>\n<h2><b>En r\u00e9sum\u00e9<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Un <\/span><b>logiciel ERP b\u00e2timent<\/b><span style=\"font-weight: 400;\"> (erp Enterprise Resource Planning) centralise les donn\u00e9es et structure les <\/span><b>processus m\u00e9tiers<\/b><span style=\"font-weight: 400;\"> par affaire.<\/span>\n<p>\u00a0<\/p>\n<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Les fonctions les plus fr\u00e9quentes : <\/span><b>chiffrage<\/b><span style=\"font-weight: 400;\">, achats, sous-traitance, <\/span><b>avancement<\/b><span style=\"font-weight: 400;\">, situations, reporting et gestion documentaire.<\/span>\n<p>\u00a0<\/p>\n<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Les prix varient surtout selon le p\u00e9rim\u00e8tre (modules, volume, soci\u00e9t\u00e9s) : certains \u00e9diteurs facturent par utilisateur, d\u2019autres par pack ou sur devis.<\/span>\n<p>\u00a0<\/p>\n<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Archipad est un outil de <\/span><a href=\"https:\/\/archipad.com\/fr\/suivi-chantier\/\"><span style=\"font-weight: 400;\">suivi de chantier<\/span><\/a><span style=\"font-weight: 400;\"> (visites, r\u00e9serves, documents) qui peut compl\u00e9ter un ERP c\u00f4t\u00e9 terrain<\/span><\/li>\n<\/ul>\n<h2><b>Comprendre ce qu\u2019est un logiciel ERP b\u00e2timent<\/b><\/h2>\n<h3><b>D\u00e9finition\u00a0<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Un <\/span><b>logiciel ERP b\u00e2timent<\/b><span style=\"font-weight: 400;\"> est un <\/span><b>logiciel de gestion<\/b><span style=\"font-weight: 400;\"> int\u00e9gr\u00e9 qui centralise les donn\u00e9es et structure les <\/span><b>processus m\u00e9tiers<\/b><span style=\"font-weight: 400;\"> d\u2019une entreprise de construction.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">ERP signifie <\/span><b>ERP (<\/b><a href=\"https:\/\/fr.wikipedia.org\/wiki\/Progiciel_de_gestion_int%C3%A9gr%C3%A9\" target=\"_blank\" rel=\"noopener\"><b>Enterprise Resource Planning<\/b><\/a><b>)<\/b><span style=\"font-weight: 400;\"> : la planification des ressources de l\u2019entreprise.Dans le BTP, beaucoup d\u2019ERP sont organis\u00e9s \u2018par affaires\u2019 : chaque chantier est suivi avec ses budgets, ses co\u00fbts, ses achats, sa facturation et ses indicateurs.<\/span><\/p>\n<h3><b>Que fait un ERP au quotidien ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Un ERP est utile en g\u00e9n\u00e9ral pour :<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">consolider l\u2019activit\u00e9 (budgets, engagements, facturation, reporting) ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">fiabiliser les flux administratifs et financiers ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">rendre les \u00e9carts plus visibles (pr\u00e9vu vs r\u00e9el).<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Selon l\u2019ERP et ses modules terrain, la collecte d\u2019infos (photos, constats, r\u00e9serves\u2026) peut \u00eatre limit\u00e9e, d\u2019o\u00f9 l\u2019usage d\u2019outils compl\u00e9mentaires.\u00a0<\/span><\/p>\n<h3><b>Quand envisager un ERP b\u00e2timent dans une PME ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Pour une <\/span><b>pme du btp<\/b><span style=\"font-weight: 400;\">, l\u2019ERP devient souvent int\u00e9ressant quand :<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">les chantiers se multiplient et les ressaisies explosent ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">la lecture de la marge est difficile (achats et sous-traitance mal \u201caccroch\u00e9s\u201d aux affaires) ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">le suivi d\u2019avancement et de facturation manque de cadence ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">les <\/span><b>\u00e9quipes sur le terrain<\/b><span style=\"font-weight: 400;\"> et le bureau n\u2019ont pas le m\u00eame niveau d\u2019information.<\/span><\/li>\n<\/ul>\n<p><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-41576da elementor-widget elementor-widget-jet-listing-grid\" data-id=\"41576da\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;columns&quot;:&quot;1&quot;}\" data-widget_type=\"jet-listing-grid.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"jet-listing-grid jet-listing\"><div class=\"jet-listing-grid__items grid-col-desk-1 grid-col-tablet-1 grid-col-mobile-1 jet-listing-grid--14231\" data-queried-id=\"17140|WP_Post\" data-nav=\"{&quot;enabled&quot;:false,&quot;type&quot;:null,&quot;more_el&quot;:null,&quot;query&quot;:[],&quot;widget_settings&quot;:{&quot;lisitng_id&quot;:14231,&quot;posts_num&quot;:1,&quot;columns&quot;:1,&quot;columns_tablet&quot;:1,&quot;columns_mobile&quot;:1,&quot;column_min_width&quot;:240,&quot;column_min_width_tablet&quot;:240,&quot;column_min_width_mobile&quot;:240,&quot;inline_columns_css&quot;:false,&quot;is_archive_template&quot;:&quot;&quot;,&quot;post_status&quot;:[&quot;publish&quot;],&quot;use_random_posts_num&quot;:&quot;&quot;,&quot;max_posts_num&quot;:9,&quot;not_found_message&quot;:&quot;No data was found&quot;,&quot;is_masonry&quot;:false,&quot;equal_columns_height&quot;:&quot;&quot;,&quot;use_load_more&quot;:&quot;&quot;,&quot;load_more_id&quot;:&quot;&quot;,&quot;load_more_type&quot;:&quot;click&quot;,&quot;load_more_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:0,&quot;sizes&quot;:[]},&quot;use_custom_post_types&quot;:&quot;&quot;,&quot;custom_post_types&quot;:[],&quot;hide_widget_if&quot;:&quot;&quot;,&quot;carousel_enabled&quot;:&quot;&quot;,&quot;slides_to_scroll&quot;:&quot;1&quot;,&quot;arrows&quot;:&quot;true&quot;,&quot;arrow_icon&quot;:&quot;fa fa-angle-left&quot;,&quot;dots&quot;:&quot;&quot;,&quot;autoplay&quot;:&quot;true&quot;,&quot;pause_on_hover&quot;:&quot;true&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;true&quot;,&quot;center_mode&quot;:&quot;&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500,&quot;inject_alternative_items&quot;:&quot;&quot;,&quot;injection_items&quot;:[],&quot;scroll_slider_enabled&quot;:&quot;&quot;,&quot;scroll_slider_on&quot;:[&quot;desktop&quot;,&quot;tablet&quot;,&quot;mobile&quot;],&quot;custom_query&quot;:false,&quot;custom_query_id&quot;:&quot;&quot;,&quot;_element_id&quot;:&quot;&quot;,&quot;collapse_first_last_gap&quot;:false,&quot;list_tag_selection&quot;:&quot;&quot;,&quot;list_items_wrapper_tag&quot;:&quot;div&quot;,&quot;list_item_tag&quot;:&quot;div&quot;,&quot;empty_items_wrapper_tag&quot;:&quot;div&quot;}}\" data-page=\"1\" data-pages=\"213\" data-listing-source=\"posts\" data-listing-id=\"14231\" data-query-id=\"\"><div class=\"jet-listing-grid__item jet-listing-dynamic-post-15547\" data-post-id=\"15547\"  ><div class=\"jet-engine-listing-overlay-wrap\" data-url=\"https:\/\/auth.archipad.com\/registration?return_to=https:\/\/archipad.com\/fr\/page-remerciement-inscription\" data-target=\"_blank\">\t\t<div data-elementor-type=\"jet-listing-items\" data-elementor-id=\"14231\" class=\"elementor elementor-14231\" data-elementor-post-type=\"jet-engine\">\n\t\t\t\t<div class=\"elementor-element elementor-element-131d650 e-con-full bannerintra e-flex e-con e-parent\" data-id=\"131d650\" data-element_type=\"container\" data-e-type=\"container\" id=\"bannerintra\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t<div class=\"elementor-element elementor-element-67386eb e-con-full e-flex e-con e-child\" data-id=\"67386eb\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t<div class=\"elementor-element elementor-element-6ea2823 e-con-full e-flex e-con e-child\" data-id=\"6ea2823\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-624c08d elementor-widget elementor-widget-image\" data-id=\"624c08d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"528\" src=\"https:\/\/archipad.com\/wp-content\/uploads\/2025\/05\/essayez-gratuitement-archipad.png\" class=\"attachment-large size-large wp-image-14233\" alt=\"Essayez gratuitement Archipad\" srcset=\"https:\/\/archipad.com\/wp-content\/uploads\/2025\/05\/essayez-gratuitement-archipad.png 800w, https:\/\/archipad.com\/wp-content\/uploads\/2025\/05\/essayez-gratuitement-archipad-300x198.png 300w, https:\/\/archipad.com\/wp-content\/uploads\/2025\/05\/essayez-gratuitement-archipad-768x507.png 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-edf4bdc e-con-full e-flex e-con e-child\" data-id=\"edf4bdc\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t<div class=\"elementor-element elementor-element-9bf3882 e-con-full banner2 e-flex e-con e-child\" data-id=\"9bf3882\" data-element_type=\"container\" data-e-type=\"container\" id=\"banner2\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8690160 elementor-widget elementor-widget-heading\" data-id=\"8690160\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">Suivez votre chantier au <span style=\"text-decoration: underline\">bureau<\/span>, comme sur le <span style=\"text-decoration: underline\">terrain<\/span><\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-23100f8 e-con-full e-flex e-con e-child\" data-id=\"23100f8\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t<div class=\"elementor-element elementor-element-6a0b4a1 e-con-full e-flex e-con e-child\" data-id=\"6a0b4a1\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1ed6c4a elementor-widget elementor-widget-jet-inline-svg\" data-id=\"1ed6c4a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"jet-inline-svg.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-jet-inline-svg jet-elements\"><div class=\"jet-inline-svg__wrapper\"><div class=\"jet-inline-svg jet-inline-svg--custom-width\"><div class=\"jet-inline-svg__inner\"><?xml version=\"1.0\" encoding=\"UTF-8\"?>\n<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"45\" height=\"45\" viewBox=\"0 0 45 45\" fill=\"none\">\n  <rect width=\"45\" height=\"45\" rx=\"22.5\" fill=\"#1A1A1A\"><\/rect>\n  <g clip-path=\"url(#clip0_607_293)\">\n    <path d=\"M12.4626 22.5H32.5376\" stroke=\"white\" stroke-width=\"2.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path>\n    <path d=\"M24.4543 30.5832L32.5377 22.5L24.4543 14.4168\" stroke=\"white\" stroke-width=\"2.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path>\n  <\/g>\n  <defs>\n    <clipPath id=\"clip0_607_293\">\n      <rect width=\"22.5621\" height=\"18.6535\" fill=\"white\" transform=\"translate(11.219 13.1732)\"><\/rect>\n    <\/clipPath>\n  <\/defs>\n<\/svg>\n<\/div><\/div><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6924f83 e-con-full e-flex e-con e-child\" data-id=\"6924f83\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0c0cacf elementor-widget elementor-widget-heading\" data-id=\"0c0cacf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-heading-title elementor-size-default\">Tester gratuitement<\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-535fc26 e-con-full e-flex e-con e-child\" data-id=\"535fc26\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t<div class=\"elementor-element elementor-element-fd87ff4 e-con-full e-flex e-con e-child\" data-id=\"fd87ff4\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0fdb114 elementor-position-inline-start elementor-mobile-position-inline-start elementor-view-default elementor-widget elementor-widget-icon-box\" data-id=\"0fdb114\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-box.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-icon-box-wrapper\">\n\n\t\t\t\t\t\t<div class=\"elementor-icon-box-icon\">\n\t\t\t\t<span  class=\"elementor-icon\">\n\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"28\" height=\"28\" viewBox=\"0 0 28 28\" fill=\"none\"><rect width=\"28\" height=\"28\" rx=\"14\" fill=\"#E33D2E\"><\/rect><mask id=\"mask0_607_298\" style=\"mask-type:alpha\" maskUnits=\"userSpaceOnUse\" x=\"2\" y=\"2\" width=\"24\" height=\"24\"><rect x=\"2\" y=\"2\" width=\"24\" height=\"24\" fill=\"#D9D9D9\"><\/rect><\/mask><g mask=\"url(#mask0_607_298)\"><path d=\"M8.023 19.2923C8.873 18.6616 9.799 18.1635 10.801 17.798C11.8028 17.4327 12.8692 17.25 14 17.25C15.1308 17.25 16.1972 17.4327 17.199 17.798C18.201 18.1635 19.127 18.6616 19.977 19.2923C20.5987 18.6089 21.0913 17.8179 21.4548 16.9192C21.8183 16.0206 22 15.0475 22 14C22 11.7833 21.2208 9.89583 19.6625 8.3375C18.1042 6.77917 16.2167 6 14 6C11.7833 6 9.89583 6.77917 8.3375 8.3375C6.77917 9.89583 6 11.7833 6 14C6 15.0475 6.18175 16.0206 6.54525 16.9192C6.90875 17.8179 7.40133 18.6089 8.023 19.2923ZM14.0003 14.75C13.0873 14.75 12.3173 14.4367 11.6905 13.81C11.0635 13.1832 10.75 12.4133 10.75 11.5003C10.75 10.5873 11.0633 9.81733 11.69 9.1905C12.3168 8.5635 13.0868 8.25 13.9998 8.25C14.9128 8.25 15.6827 8.56333 16.3095 9.19C16.9365 9.81683 17.25 10.5867 17.25 11.4997C17.25 12.4127 16.9367 13.1827 16.31 13.8095C15.6832 14.4365 14.9133 14.75 14.0003 14.75ZM14 23.5C12.6808 23.5 11.4433 23.2519 10.2875 22.7558C9.13167 22.2596 8.12625 21.5839 7.27125 20.7288C6.41608 19.8738 5.74042 18.8683 5.24425 17.7125C4.74808 16.5567 4.5 15.3192 4.5 14C4.5 12.6808 4.74808 11.4433 5.24425 10.2875C5.74042 9.13167 6.41608 8.12625 7.27125 7.27125C8.12625 6.41608 9.13167 5.74042 10.2875 5.24425C11.4433 4.74808 12.6808 4.5 14 4.5C15.3192 4.5 16.5567 4.74808 17.7125 5.24425C18.8683 5.74042 19.8738 6.41608 20.7288 7.27125C21.5839 8.12625 22.2596 9.13167 22.7558 10.2875C23.2519 11.4433 23.5 12.6808 23.5 14C23.5 15.3192 23.2519 16.5567 22.7558 17.7125C22.2596 18.8683 21.5839 19.8738 20.7288 20.7288C19.8738 21.5839 18.8683 22.2596 17.7125 22.7558C16.5567 23.2519 15.3192 23.5 14 23.5ZM14 22C14.9025 22 15.7727 21.8548 16.6105 21.5645C17.4483 21.274 18.1922 20.8679 18.8422 20.3462C18.1922 19.8436 17.458 19.4519 16.6395 19.1712C15.8208 18.8904 14.941 18.75 14 18.75C13.059 18.75 12.1776 18.8888 11.3558 19.1663C10.5339 19.4439 9.80125 19.8372 9.15775 20.3462C9.80775 20.8679 10.5517 21.274 11.3895 21.5645C12.2273 21.8548 13.0975 22 14 22ZM14 13.25C14.4975 13.25 14.9135 13.0827 15.248 12.748C15.5827 12.4135 15.75 11.9975 15.75 11.5C15.75 11.0025 15.5827 10.5865 15.248 10.252C14.9135 9.91733 14.4975 9.75 14 9.75C13.5025 9.75 13.0865 9.91733 12.752 10.252C12.4173 10.5865 12.25 11.0025 12.25 11.5C12.25 11.9975 12.4173 12.4135 12.752 12.748C13.0865 13.0827 13.5025 13.25 14 13.25Z\" fill=\"white\"><\/path><\/g><\/svg>\t\t\t\t<\/span>\n\t\t\t<\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-icon-box-content\">\n\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-box-title\">\n\t\t\t\t\t\t<span  >\n\t\t\t\t\t\t\t+150 000\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<p class=\"elementor-icon-box-description\">\n\t\t\t\t\t\tUtilisateurs\t\t\t\t\t<\/p>\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9cc2fad e-con-full e-flex e-con e-child\" data-id=\"9cc2fad\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d84ba69 elementor-position-inline-start elementor-mobile-position-inline-start elementor-view-default elementor-widget elementor-widget-icon-box\" data-id=\"d84ba69\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-box.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-icon-box-wrapper\">\n\n\t\t\t\t\t\t<div class=\"elementor-icon-box-icon\">\n\t\t\t\t<span  class=\"elementor-icon\">\n\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"28\" height=\"28\" viewBox=\"0 0 28 28\" fill=\"none\"><rect width=\"28\" height=\"28\" rx=\"14\" fill=\"#E33D2E\"><\/rect><mask id=\"mask0_607_300\" style=\"mask-type:alpha\" maskUnits=\"userSpaceOnUse\" x=\"2\" y=\"2\" width=\"24\" height=\"24\"><rect x=\"2\" y=\"2\" width=\"24\" height=\"24\" fill=\"#D9D9D9\"><\/rect><\/mask><g mask=\"url(#mask0_607_300)\"><path d=\"M8.69221 24.5V16.9098L5.35571 11.5L9.67296 4.5H18.327L22.6442 11.5L19.3077 16.9098V24.5L14 22.702L8.69221 24.5ZM10.1922 22.3788L14 21.1115L17.8077 22.3788V18.5H10.1922V22.3788ZM10.5095 6L7.10946 11.5L10.5095 17H17.4905L20.8905 11.5L17.4905 6H10.5095ZM12.95 15.2192L9.75571 12.05L10.825 10.9807L12.95 13.1058L17.175 8.85575L18.2442 9.9L12.95 15.2192Z\" fill=\"white\"><\/path><\/g><\/svg>\t\t\t\t<\/span>\n\t\t\t<\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-icon-box-content\">\n\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-box-title\">\n\t\t\t\t\t\t<span  >\n\t\t\t\t\t\t\tN\u00b01 du BTP\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<p class=\"elementor-icon-box-description\">\n\t\t\t\t\t\ten France\t\t\t\t\t<\/p>\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<a href=\"https:\/\/auth.archipad.com\/registration?return_to=https:\/\/archipad.com\/fr\/page-remerciement-inscription\" class=\"jet-engine-listing-overlay-link\" target=\"_blank\"><\/a><\/div><\/div><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0722da7 elementor-widget elementor-widget-text-editor\" data-id=\"0722da7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><\/p>\n<h2><b style=\"color: inherit; font-family: inherit; font-size: 2rem;\">Quelles fonctionnalit\u00e9s attendre d\u2019un ERP BTP ?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Chaque \u00e9diteur a ses modules et son vocabulaire. Le tableau ci-dessous r\u00e9sume les grandes fonctions et leur int\u00e9r\u00eat, sans pr\u00e9sumer d\u2019un p\u00e9rim\u00e8tre identique d\u2019un outil \u00e0 l\u2019autre.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p><b>Fonctionnalit\u00e9<\/b><\/p>\n<\/td>\n<td>\n<p><b>Ce que l\u2019ERP peut inclure (selon modules\/\u00e9diteur)<\/b><\/p>\n<\/td>\n<td>\n<p><b>Int\u00e9r\u00eat en BTP<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Chiffrage et devis<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Devis, biblioth\u00e8ques, variantes\/options (selon outils)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">fiabiliser l\u2019\u00e9tude de prix<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Budget et suivi par affaire<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Budgets, lots, analytique chantier<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">piloter marge et \u00e9carts<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Gestion des achats<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Demandes, commandes, <\/span><a href=\"https:\/\/archipad.com\/fr\/reception-chantier\/\"><span style=\"font-weight: 400;\">r\u00e9ceptions<\/span><\/a><span style=\"font-weight: 400;\">, factures fournisseurs (selon param\u00e9trage)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">ma\u00eetriser les engagements<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Sous-traitance<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Contrats, suivi, pi\u00e8ces et paiements (selon ERP)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">aligner co\u00fbts et avancement<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Ressources et main-d\u2019\u0153uvre<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/archipad.com\/fr\/logiciel-de-planning-de-chantier-les-10-meilleurs-comparatif-2025\/\"><span style=\"font-weight: 400;\">Planning<\/span><\/a><span style=\"font-weight: 400;\">, pointage\/temps, affectations (souvent en module)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">fiabiliser les co\u00fbts terrain<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><a href=\"https:\/\/archipad.com\/fr\/logiciel-de-gestion-de-stock-comment-maitriser-vos-chantiers\/\"><b>Stocks<\/b><\/a><b> et approvisionnements<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Stocks d\u00e9p\u00f4t\/chantier, inventaires, mouvements (variable)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">limiter ruptures et pertes<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Avancement et facturation<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Situations, factures, retenues (selon r\u00e8gles)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">s\u00e9curiser la facturation<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Comptabilit\u00e9 \/ \u00e9changes comptables<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Compta int\u00e9gr\u00e9e ou exports\/connecteurs<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">r\u00e9duire la ressaisie<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Reporting et tableaux de bord<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Indicateurs chantier (pr\u00e9vu\/engag\u00e9\/r\u00e9alis\u00e9\/factur\u00e9)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">d\u00e9cider plus vite<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Gestion documentaire<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Classement, versions, acc\u00e8s (souvent via GED)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">tracer les pi\u00e8ces chantier<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Workflows et validations<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Circuits d\u2019approbation (achats, avenants)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">encadrer les processus<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Mobilit\u00e9 \/ acc\u00e8s terrain<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Application mobile native ou outil connect\u00e9<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">faciliter la mise \u00e0 jour<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">Deux crit\u00e8res transverses m\u00e9ritent une attention particuli\u00e8re :<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Interface intuitive<\/b><span style=\"font-weight: 400;\"> : si l\u2019outil est \u201ccomplet\u201d mais peu utilis\u00e9, la donn\u00e9e devient fragile et le pilotage perd son sens.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Mises \u00e0 jour r\u00e9guli\u00e8res<\/b><span style=\"font-weight: 400;\"> : au-del\u00e0 des nouveaut\u00e9s, elles concernent aussi la <\/span><a href=\"https:\/\/archipad.com\/fr\/securite-sur-chantier\/\"><span style=\"font-weight: 400;\">s\u00e9curit\u00e9<\/span><\/a><span style=\"font-weight: 400;\"> et la conformit\u00e9. Il faut savoir comment elles s\u2019appliquent et ce qu\u2019elles changent dans vos param\u00e9trages.<\/span><\/li>\n<\/ul>\n<h2><b>Quels crit\u00e8res pour s\u00e9lectionner un ERP dans le b\u00e2timent ?<\/b><\/h2>\n<h3><b>Partir des besoins sp\u00e9cifiques<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Avant de comparer des \u00e9diteurs, clarifiez 3 \u00e0 5 priorit\u00e9s li\u00e9es \u00e0 vos <\/span><b>besoins sp\u00e9cifiques<\/b><span style=\"font-weight: 400;\">. Par exemple :<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">devis ; <\/span><a href=\"https:\/\/archipad.com\/fr\/budget-chantier\/\"><span style=\"font-weight: 400;\">budget<\/span><\/a><span style=\"font-weight: 400;\"> ; achats ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">sous-traitance ; <\/span><a href=\"https:\/\/archipad.com\/fr\/avancement-travaux\/\"><span style=\"font-weight: 400;\">avancement<\/span><\/a><span style=\"font-weight: 400;\"> ; paiement ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">pointage ; co\u00fbt ; reporting.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Un cahier des charges court et op\u00e9rationnel vaut mieux qu\u2019une liste de modules.<\/span><\/p>\n<h3><b>Tester l\u2019ERP sur un cas r\u00e9el<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Demandez une d\u00e9monstration sur une affaire repr\u00e9sentative (vos lots, vos habitudes de sous-traitance, vos r\u00e8gles de facturation).&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">L\u2019objectif : v\u00e9rifier la continuit\u00e9 du chiffrage au suivi, puis \u00e0 la facturation, sans retraitements.<\/span><\/p>\n<h3><b>V\u00e9rifier ergonomie et mobilit\u00e9<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Une <\/span><b>interface intuitive<\/b><span style=\"font-weight: 400;\"> facilite l\u2019adoption et am\u00e9liore la qualit\u00e9 des donn\u00e9es. La <\/span><b>solution mobile ou <\/b><a href=\"https:\/\/archipad.com\/fr\/tablette-chantier\/\"><b>tablette<\/b><\/a><span style=\"font-weight: 400;\"> (application native ou outil connect\u00e9) est pertinente si elle :<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">simplifie la saisie pour les <\/span><b>\u00e9quipes sur le terrain<\/b><span style=\"font-weight: 400;\"> ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">acc\u00e9l\u00e8re la <\/span><b>mise \u00e0 jour<\/b><span style=\"font-weight: 400;\"> des informations chantier ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">\u00e9vite les ressaisies et les informations \u201cnon trac\u00e9es\u201d.<\/span>\n<p><\/p>\n<\/li>\n<\/ul>\n<h3><b>Quel budget pr\u00e9voir pour un ERP b\u00e2timent ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Les budgets varient selon le p\u00e9rim\u00e8tre et l\u2019accompagnement (param\u00e9trage, reprise de donn\u00e9es, formation). Voici des rep\u00e8res utiles.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p><b>Niveau de solution ERP<\/b><\/p>\n<\/td>\n<td>\n<p><b>P\u00e9rim\u00e8tre g\u00e9n\u00e9ralement couvert<\/b><\/p>\n<\/td>\n<td>\n<p><b>Licence <\/b><a href=\"https:\/\/fr.wikipedia.org\/wiki\/Software_as_a_service\" target=\"_blank\" rel=\"noopener\"><b>SaaS<\/b><\/a><b> (rep\u00e8re)<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Socle gestion<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">devis, facturation, clients\/fournisseurs, articles<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">20 \u00e0 60 \u20ac \/ utilisateur \/ mois<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Gestion + chiffrage<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">biblioth\u00e8ques, chiffrage plus structur\u00e9, exports<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">40 \u00e0 90 \u20ac \/ utilisateur \/ mois<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Gestion d\u2019affaires<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">budget chantier, analytique, achats\/engagements, multi-chantiers<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">70 \u00e0 140 \u20ac \/ utilisateur \/ mois<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Affaires + facturation chantier<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">avancement, situations, retenues, <\/span><a href=\"https:\/\/archipad.com\/fr\/comment-mieux-gerer-vos-sous-traitants-grace-au-digital\/\"><span style=\"font-weight: 400;\">sous-traitance <\/span><\/a><span style=\"font-weight: 400;\">(selon modules)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">100 \u00e0 180 \u20ac \/ utilisateur \/ mois<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Pilotage avanc\u00e9<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">reporting avanc\u00e9, restes \u00e0 faire, workflows<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">140 \u00e0 260 \u20ac \/ utilisateur \/ mois<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>Entreprise \/ multi-soci\u00e9t\u00e9s<\/b><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">consolidations, int\u00e9grations SI, sp\u00e9cifiques<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">200 \u00e0 350 \u20ac \/ utilisateur \/ mois (ou sur devis)<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">Un point souvent d\u00e9cisif : le s\u00e9rieux des <\/span><b>mises \u00e0 jour r\u00e9guli\u00e8res<\/b><span style=\"font-weight: 400;\"> (rythme, support, compatibilit\u00e9 param\u00e9trage).&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">C\u2019est un signal de p\u00e9rennit\u00e9, surtout si l\u2019ERP devient le centre de gravit\u00e9 du pilotage.<\/span><\/p>\n<h2><b>Top 12 des logiciels ERP dans le BTP en 2026<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Le \u201cmeilleur\u201d d\u00e9pend toujours du contexte. Ce tableau sert de rep\u00e8re autour du march\u00e9 des ERP.&nbsp;<\/span><\/p>\n<p><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p><b>N\u00b0<\/b><\/p>\n<\/td>\n<td>\n<p><b>Logiciel<\/b><\/p>\n<\/td>\n<td>\n<p><b>Profil fr\u00e9quent<\/b><\/p>\n<\/td>\n<td>\n<p><b>Orientation g\u00e9n\u00e9rale<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>1<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.graneet.com\/fr\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Graneet<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PME du btp<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">pilotage rentabilit\u00e9 et performance<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>2<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.sage.com\/fr-fr\/produits\/sage-batigest-i7\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Sage Batigest Connect<\/span><\/a><span style=\"font-weight: 400;\"> (logiciel de gestion)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PME<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">gestion commerciale + chantier, \u00e9cosyst\u00e8me<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>3<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/construction.orisha.com\/onaya\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Onaya<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">b\u00e2timent \/ travaux publics<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">chiffrage, suivi budg\u00e9taire<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>4<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.ixbat.com\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">iXbat<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PME\/ETI<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">gestion d\u2019affaires et suivi global<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>5<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.ebp.com\/logiciel-devis-facture-batiment\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">EBP B\u00e2timent<\/span><\/a><span style=\"font-weight: 400;\"> (logiciel devis\/facturation)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">TPE\/PME<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">devis, facturation, socle de gestion<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>6<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.extrabat.com\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Extrabat<\/span><\/a><span style=\"font-weight: 400;\"> (CRM)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">TPE\/PME<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">suite compl\u00e8te gestion + chantier<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>7<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.codial.fr\/logiciel-gestion-erp-pgi\/codial-batiment.html\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Codial B\u00e2timent<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PME<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PGI\/ERP modulaire orient\u00e9 b\u00e2timent<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>8<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/everwin.fr\/nos-solutions\/logiciel-suivi-de-chantier-everwin-gx-btp\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Everwin GX BTP<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PME\/ETI<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">gestion projet, analytique, pilotage<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>9<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.b2o.eu\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">MyB2O BTP<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PME<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">cloud, mobilit\u00e9, flexibilit\u00e9<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>10<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.brz.eu\/fr\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">BRZ France<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">ETI \/ groupes<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">couverture large, structuration SI<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>11<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.adci.fr\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Solutions BTP (ADCi)<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PME\/ETI<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">multi-chantiers, suivi financier et analytique<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><b>12<\/b><\/p>\n<\/td>\n<td>\n<p><a href=\"https:\/\/www.vertuoza.com\/fr-fr\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Vertuoza<\/span><\/a><span style=\"font-weight: 400;\"> (logiciel de gestion BTP)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">PME<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">cloud, mobilit\u00e9, simplicit\u00e9<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b><br><\/b><\/h2><h2><b>ERP et outils terrain : comment organiser l\u2019ensemble<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">La <\/span><a href=\"https:\/\/archipad.com\/fr\/digitalisation-de-chantier\/\"><span style=\"font-weight: 400;\">digitalisation<\/span><\/a><span style=\"font-weight: 400;\"> recouvre des r\u00e9alit\u00e9s tr\u00e8s diff\u00e9rentes dans le btp : certaines entreprises commencent par un <\/span><b>logiciel ERP <\/b><span style=\"font-weight: 400;\">pour structurer la gestion, d\u2019autres privil\u00e9gient d\u2019abord des outils orient\u00e9s terrain (<\/span><a href=\"https:\/\/archipad.com\/fr\/meilleur-logiciel-suivi-de-chantier\/\"><span style=\"font-weight: 400;\">logiciel de suivi de chantier<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/archipad.com\/fr\/ged-chantier\/\"><span style=\"font-weight: 400;\">GED<\/span><\/a><span style=\"font-weight: 400;\">, mobilit\u00e9) pour mieux capter et organiser les informations d\u2019ex\u00e9cution.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Dans tous les cas, l\u2019objectif reste souvent le m\u00eame : disposer de donn\u00e9es plus coh\u00e9rentes (photos, constats, avancement, r\u00e9serves) et plus faciles \u00e0 partager entre le bureau et les \u00e9quipes sur le terrain.<\/span><\/p>\n<h3><b>Comment Archipad compl\u00e8te votre logiciel ERP ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Archipad intervient c\u00f4t\u00e9 ex\u00e9cution, en compl\u00e9ment d\u2019un ERP ou d\u2019un dispositif plus l\u00e9ger, pour structurer l\u2019information chantier.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">En pratique, cela aide \u00e0 :<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>centraliser les documents <\/b><span style=\"font-weight: 400;\">op\u00e9rationnels (plans, photos, observations, comptes rendus) ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>fluidifier les \u00e9changes <\/b><span style=\"font-weight: 400;\">sans multiplier les canaux ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>s\u00e9curiser la tra\u00e7abilit\u00e9<\/b><span style=\"font-weight: 400;\">, notamment pour les r\u00e9serves et le suivi qualit\u00e9 ;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">acc\u00e9l\u00e9rer la mise \u00e0 jour des \u00e9l\u00e9ments chantier pour conserver une lecture plus coh\u00e9rente.<\/span><\/li>\n<\/ul>\n<h2><b>Conclusion<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Un logiciel ERP b\u00e2timent structure les processus m\u00e9tiers et consolide les donn\u00e9es par affaire : chiffrage, engagements, avancement et facturation.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Les modules comptent, mais l\u2019interface intuitive, la mobilit\u00e9 et les mises \u00e0 jour r\u00e9guli\u00e8res p\u00e8sent autant sur la qualit\u00e9 de la vision globale.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Pour choisir une solution ERP, le plus simple est de formaliser vos besoins sp\u00e9cifiques, de tester sur une affaire type et de cadrer le niveau de prix correspondant.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Selon l\u2019organisation, des outils terrain peuvent compl\u00e9ter l\u2019ERP ; un logiciel de suivi de chantier comme Archipad aide alors \u00e0 structurer et partager l\u2019information d\u2019ex\u00e9cution.<\/span><\/p>\n<p><\/p>\n<h2><b>FAQ<\/b><\/h2>\n<h3><b>1. Qu&rsquo;est-ce qu&rsquo;un logiciel ERP BTP ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Un <\/span><a href=\"https:\/\/archipad.com\/fr\/erp-btp\/\"><span style=\"font-weight: 400;\">ERP<\/span><\/a><span style=\"font-weight: 400;\"> dans le BTP est un logiciel de gestion con\u00e7u pour le b\u00e2timent et les travaux publics. Il centralise les donn\u00e9es et organise les processus m\u00e9tiers pour piloter l\u2019activit\u00e9.<\/span><\/p>\n<h3><b>2. Quels sont les ERP les plus utilis\u00e9s ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Dans le BTP, on retrouve souvent des solutions comme Sage Batigest Connect, EBP B\u00e2timent, Codial B\u00e2timent, Extrabat, Onaya, Everwin SX BTP, iXbat, Vertuoza ou Graneet, selon la taille et les besoins.<\/span><\/p>\n<h3><b>3. Quel est le meilleur <\/b><a href=\"https:\/\/archipad.com\/fr\/meilleur-logiciel-btp\"><b>logiciel BTP<\/b><\/a><b> ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Il n\u2019existe pas de meilleur logiciel unique : tout d\u00e9pend des besoins sp\u00e9cifiques. Un ERP sert surtout \u00e0 consolider la gestion et la vision globale, tandis qu\u2019un logiciel de suivi de chantier peut \u00eatre prioritaire si l\u2019enjeu principal est l\u2019ex\u00e9cution terrain.<\/span><\/p>\n<h3><b>4. Quel est le meilleur <\/b><a href=\"https:\/\/archipad.com\/fr\/logiciel-batiment\/\"><b>logiciel<\/b><\/a><b> gratuit pour le BTP ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Un ERP complet est rarement gratuit. <\/span><a href=\"https:\/\/www.microsoft.com\/fr-fr\/microsoft-365\/excel\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Excel<\/span><\/a><span style=\"font-weight: 400;\"> peut aider sur des t\u00e2ches simples, mais il ne remplace pas un ERP en mati\u00e8re de droits, de tra\u00e7abilit\u00e9 et d\u2019automatisation.<\/span><\/p>\n<h3><b>5. C&rsquo;est quoi la diff\u00e9rence entre SAP et ERP ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">ERP d\u00e9signe une cat\u00e9gorie de logiciels. SAP est un \u00e9diteur qui propose des solutions ERP, comme SAP S\/4HANA.<\/span><\/p>\n<h3><b>6. Excel est-il un outil ERP ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Non, Excel est un tableur. Il peut structurer des donn\u00e9es, mais il ne fournit pas une base unique, des workflows et une tra\u00e7abilit\u00e9 \u00e9quivalents \u00e0 un ERP.<\/span><\/p>\n<h3><b>7. Quels sont les inconv\u00e9nients d&rsquo;un ERP ?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Un ERP peut demander un projet structur\u00e9 : param\u00e9trage, reprise de donn\u00e9es et conduite du changement. Un pilote sur une affaire type limite g\u00e9n\u00e9ralement ces risques.<\/span><\/p>\n<p><\/p>\n<p><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Logiciel ERP b\u00e2timent : comment le choisir ? Le choix d\u2019un logiciel ERP b\u00e2timent repose surtout sur le p\u00e9rim\u00e8tre r\u00e9el (chiffrage, achats, sous-traitance, situations), les r\u00e8gles de gestion (avancement, retenues, analytique) et la fa\u00e7on dont l\u2019outil suit une affaire du d\u00e9but \u00e0 la fin. Cet article d\u00e9finit l\u2019ERP (Enterprise Resource Planning) appliqu\u00e9 au b\u00e2timent et [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":17141,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jet_sm_ready_style":".jet-sm-gb-17f124cd-2f45-44a8-8acc-708d3cfaf8cf .jet-listing-not-found{color: ;} ","_jet_sm_style":"{\"jet-sm-gb-17f124cd-2f45-44a8-8acc-708d3cfaf8cf\":{\".jet-sm-gb-17f124cd-2f45-44a8-8acc-708d3cfaf8cf .jet-listing-not-found\":{\"not_found_color\":{\"value\":\"color: ;\"}}}}","_jet_sm_controls_values":"{\"jet-sm-gb-17f124cd-2f45-44a8-8acc-708d3cfaf8cf\":{\"horizontal_gap\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"vertical_gap\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"loader_color\":{\"value\":\"\"},\"loader_size\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"loader_text_color\":{\"value\":\"\"},\"loader_text_typography\":{\"value\":{\"family\":\"inherit\",\"size\":14,\"s_unit\":\"px\",\"weight\":\"400\",\"transform\":\"inherit\",\"style\":\"inherit\",\"decoration\":\"inherit\",\"lineHeight\":1.2,\"lh_unit\":\"\",\"letterSpacing\":0,\"ls_unit\":\"px\"}},\"center_mode_padding\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"arrows_box_size\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"arrows_size\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"arrows_z_index\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"arrow_color\":{\"value\":\"\"},\"arrow_bg_color\":{\"value\":\"\"},\"arrow_color_hover\":{\"value\":\"\"},\"arrow_bg_color_hover\":{\"value\":\"\"},\"dots_size\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"dots_gap\":{\"value\":{\"value\":0,\"unit\":\"px\"}},\"dots_bg_color\":{\"value\":\"\"},\"dots_bg_color_hover\":{\"value\":\"\"},\"dots_bg_color_active\":{\"value\":\"\"},\"not_found_typography\":{\"value\":{\"family\":\"inherit\",\"size\":14,\"s_unit\":\"px\",\"weight\":\"400\",\"transform\":\"inherit\",\"style\":\"inherit\",\"decoration\":\"inherit\",\"lineHeight\":1.2,\"lh_unit\":\"\",\"letterSpacing\":0,\"ls_unit\":\"px\"}},\"not_found_color\":{\"value\":\"\"}}}","_jet_sm_fonts_collection":"{}","_jet_sm_fonts_links":"\"<link rel=\\\"preconnect\\\" href=\\\"https:\/\/fonts.gstatic.com\\\">\"","footnotes":""},"categories":[178],"tags":[],"class_list":["post-17140","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-conseils-astuces"],"_links":{"self":[{"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/posts\/17140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/comments?post=17140"}],"version-history":[{"count":14,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/posts\/17140\/revisions"}],"predecessor-version":[{"id":17242,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/posts\/17140\/revisions\/17242"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/media\/17141"}],"wp:attachment":[{"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/media?parent=17140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/categories?post=17140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/tags?post=17140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}