{"id":15913,"date":"2025-09-01T06:48:00","date_gmt":"2025-09-01T06:48:00","guid":{"rendered":"https:\/\/archipad.com\/?p=15913"},"modified":"2025-12-04T13:08:38","modified_gmt":"2025-12-04T13:08:38","slug":"levee-de-reserve","status":"publish","type":"post","link":"https:\/\/archipad.com\/fr\/levee-de-reserve\/","title":{"rendered":"Tout savoir sur la lev\u00e9e de r\u00e9serve + PV \u00e0 t\u00e9l\u00e9charger"},"content":{"rendered":"\n<p><strong>Pourquoi la lev\u00e9e de r\u00e9serve est-elle la cl\u00e9 d\u2019une r\u00e9ception r\u00e9ussie ?<br><br><\/strong>La r\u00e9ception d\u2019un chantier est un moment charni\u00e8re\u2026 mais pas forc\u00e9ment la fin des ennuis. Travaux incomplets, d\u00e9fauts d\u2019ex\u00e9cution, prestations oubli\u00e9es\u202f: les r\u00e9serves peuvent rallonger les d\u00e9lais et compliquer la relation client-entreprise si elles ne sont pas g\u00e9r\u00e9es avec rigueur.<\/p>\n\n\n\n<p>Dans cet article, nous d\u00e9taillons ce qu\u2019est la lev\u00e9e de r\u00e9serve, quand et comment elle intervient, qui elle concerne et dans quel cadre juridique elle s\u2019inscrit. Vous d\u00e9couvrirez \u00e9galement comment agir en cas de blocage, et pourquoi formaliser cette \u00e9tape est indispensable pour s\u00e9curiser la cl\u00f4ture du chantier.<\/p>\n\n\n\n<p>Mieux comprendre les r\u00e8gles autour des r\u00e9serves, c\u2019est gagner en efficacit\u00e9, \u00e9viter les conflits, et garantir un <a href=\"https:\/\/archipad.com\/fr\/suivi-chantier\/\">suivi de chantier<\/a> ma\u00eetris\u00e9 de bout en bout.<\/p>\n\n\n\n<p>Pour ma\u00eetriser cette \u00e9tape dans les r\u00e8gles de l\u2019art, voici tout ce qu\u2019il faut savoir sur la lev\u00e9e de r\u00e9serve : d\u00e9finition, d\u00e9lais, responsabilit\u00e9s des intervenants et bonnes pratiques pour \u00e9viter tout <a href=\"https:\/\/archipad.com\/fr\/litige-chantier\/\">litige<\/a>.<br><br>Lisez aussi notre article consacr\u00e9 au <a href=\"https:\/\/archipad.com\/fr\/quitus-levee-des-reserves\/\">quitus de lev\u00e9e des r\u00e9serves<\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>En r\u00e9sum\u00e9&nbsp;<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>La <strong>lev\u00e9e de r\u00e9serve<\/strong> suit la <strong>r\u00e9ception des travaux<\/strong> et vise \u00e0 corriger les points signal\u00e9s.<br><\/li>\n\n\n\n<li>Elle porte sur des <strong>malfa\u00e7ons<\/strong>, des <strong>prestations non r\u00e9alis\u00e9es<\/strong> ou des <strong>\u00e9l\u00e9ments \u00e0 tester<\/strong>.<br><\/li>\n\n\n\n<li>Aucun <strong>d\u00e9lai l\u00e9gal<\/strong>, mais des <strong>d\u00e9lais contractuels<\/strong> doivent \u00eatre respect\u00e9s.<br><\/li>\n\n\n\n<li>La <strong>garantie de parfait ach\u00e8vement<\/strong> couvre ces corrections pendant <strong>un an<\/strong>.<br><\/li>\n\n\n\n<li>En cas de blocage, une <strong>mise en demeure<\/strong> ou un recours au <strong>juge des r\u00e9f\u00e9r\u00e9s<\/strong> est possible.<br><\/li>\n\n\n\n<li><strong>Archipad<\/strong> permet de <strong>centraliser<\/strong>, <strong>suivre<\/strong> et <strong>valider<\/strong> chaque r\u00e9serve avec rigueur.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Qu\u2019est-ce que la lev\u00e9e de r\u00e9serve dans le BTP ?<\/strong><\/h2>\n\n\n\n<p><strong>D\u00e9finition et fonction<\/strong><\/p>\n\n\n\n<p>La lev\u00e9e de r\u00e9serve d\u00e9signe l\u2019ensemble des actions entreprises pour corriger les anomalies relev\u00e9es lors de la r\u00e9ception d\u2019un chantier. Elle se conclut par une validation formelle via un proc\u00e8s verbal de lev\u00e9e, attestant que les points non conformes ont \u00e9t\u00e9 r\u00e9solus.<\/p>\n\n\n\n<p>Ces <strong>r\u00e9serves mentionn\u00e9es<\/strong> sont consign\u00e9es dans le <strong>proc\u00e8s verbal de <\/strong><a href=\"https:\/\/archipad.com\/fr\/reception-chantier\/\"><strong>r\u00e9ception des travaux<\/strong><\/a>. Elles peuvent concerner des malfa\u00e7ons, des prestations incompl\u00e8tes ou des \u00e9l\u00e9ments \u00e0 tester. Une fois lev\u00e9es, elles permettent d\u2019acter la conformit\u00e9 de l\u2019ouvrage.<\/p>\n\n\n\n<p>Elles sont g\u00e9n\u00e9ralement identifi\u00e9es lors de la visite de r\u00e9ception, moment cl\u00e9 o\u00f9 le ma\u00eetre d\u2019ouvrage v\u00e9rifie la conformit\u00e9 du chantier et consigne toutes les non-conformit\u00e9s observ\u00e9es. En pratique, la lev\u00e9e de r\u00e9serves s\u2019inscrit dans un cadre contractuel et juridique pr\u00e9cis, en articulation avec la <a href=\"https:\/\/archipad.com\/fr\/garantie-parfait-achevement\/\">garantie de parfait ach\u00e8vement<\/a>.<\/p>\n\n\n\n<p><strong>Trois types de r\u00e9serves \u00e0 distinguer<\/strong><\/p>\n\n\n\n<p>Dans le cadre d\u2019un chantier, les r\u00e9serves peuvent prendre diff\u00e9rentes formes :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>R\u00e9serves pour <\/strong><a href=\"https:\/\/archipad.com\/fr\/malfacons-dans-le-btp\/\"><strong>malfa\u00e7ons<\/strong><\/a> : les travaux ont bien \u00e9t\u00e9 ex\u00e9cut\u00e9s, mais de mani\u00e8re non conforme ou avec des d\u00e9fauts n\u00e9cessitant des r\u00e9parations.<br><\/li>\n\n\n\n<li><strong>R\u00e9serves pour non-fa\u00e7ons<\/strong> : certaines prestations pr\u00e9vues au march\u00e9 n\u2019ont pas \u00e9t\u00e9 r\u00e9alis\u00e9es du tout.<br><\/li>\n\n\n\n<li><strong>R\u00e9serves pour essai<\/strong> : certaines v\u00e9rifications (ex. \u00e9quipements techniques) n\u00e9cessitent un d\u00e9lai d\u2019essai avant de statuer sur leur conformit\u00e9.<\/li>\n<\/ul>\n\n\n\n<p>Identifier clairement la nature de chaque r\u00e9serve est essentiel pour bien cadrer les <a href=\"https:\/\/archipad.com\/fr\/les-10-meilleurs-logiciels-de-gestion-des-interventions-btp-2025\/\">interventions<\/a> \u00e0 r\u00e9aliser.<\/p>\n\n\n\n<p>Cela permet \u00e9galement d\u2019adapter les d\u00e9lais, les intervenants et les recours en cas de d\u00e9saccord.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Un cadre juridique encadr\u00e9 par le Code civil<\/strong><\/h2>\n\n\n\n<p>La lev\u00e9e de r\u00e9serve s\u2019inscrit dans la <a href=\"https:\/\/archipad.com\/fr\/garantie-parfait-achevement\/\"><strong>garantie de parfait ach\u00e8vement<\/strong><\/a>, pr\u00e9vue \u00e0 l\u2019<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443552\" target=\"_blank\" rel=\"noopener\">article <strong>1792-6<\/strong><\/a><strong> du Code civil<\/strong>. Elle oblige les entreprises \u00e0 r\u00e9parer les d\u00e9sordres <strong>signal\u00e9s \u00e0 la r\u00e9ception ou dans l\u2019ann\u00e9e qui suit<\/strong>, soit <strong>pendant un an \u00e0 compter de la r\u00e9ception<\/strong>.<\/p>\n\n\n\n<p>Dans certains cas (en particulier en march\u00e9s priv\u00e9s), la <a href=\"https:\/\/www.boutique.afnor.org\/fr-fr\/norme\/nf-p03001\/marches-prives-cahiers-types-cahier-des-clauses-administratives-generales-a\/fa188203\/1682\" target=\"_blank\" rel=\"noopener\">norme <strong>NF P 03-001<\/strong><\/a> peut aussi s\u2019appliquer. Elle sugg\u00e8re un d\u00e9lai de 60 jours pour lever les r\u00e9serves, en l\u2019absence d\u2019accord entre les parties.<\/p>\n\n\n\n<p>La norme NF P 03-001 reste une r\u00e9f\u00e9rence utile en l\u2019absence de pr\u00e9cision contractuelle, m\u00eame si elle n\u2019a pas valeur obligatoire.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>D\u00e9lais, proc\u00e9dure et r\u00f4les des intervenants<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>D\u00e9lais fix\u00e9s par les parties<\/strong><\/h3>\n\n\n\n<p>Il n\u2019existe pas de <strong>d\u00e9lai l\u00e9gal de lev\u00e9e de r\u00e9serve<\/strong> universel. En revanche, un <strong>d\u00e9lai pour lever les r\u00e9serves<\/strong> est g\u00e9n\u00e9ralement d\u00e9fini dans le <strong>PV de r\u00e9ception<\/strong> ou par \u00e9change entre les parties. Ce d\u00e9lai d\u00e9pend du type de r\u00e9serve, de sa complexit\u00e9 et des disponibilit\u00e9s des intervenants.<\/p>\n\n\n\n<p>En pratique, une p\u00e9riode de <strong>15 jours<\/strong> est souvent retenue pour des r\u00e9serves mineures. Pour les r\u00e9serves techniques ou complexes, le d\u00e9lai peut \u00eatre allong\u00e9.<\/p>\n\n\n\n<p>Le d\u00e9lai de 15 jours, souvent utilis\u00e9 en pratique, doit toujours \u00eatre valid\u00e9 contractuellement entre les parties.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Proc\u00e9dure de lev\u00e9e<\/strong><\/h3>\n\n\n\n<p>Voici les grandes \u00e9tapes de la proc\u00e9dure :<\/p>\n\n\n\n<p><strong>1.<\/strong> Les entreprises corrigent les r\u00e9serves dans les d\u00e9lais convenus.<br><strong>2.<\/strong> Une visite de v\u00e9rification est organis\u00e9e par le ma\u00eetre d\u2019ouvrage, accompagn\u00e9 du ma\u00eetre d\u2019\u0153uvre si n\u00e9cessaire.<br><strong>3.<\/strong> Si tout est conforme, un <strong>proc\u00e8s verbal de lev\u00e9e<\/strong> est \u00e9tabli et sign\u00e9 par les parties.<\/p>\n\n\n\n<p>Ce <strong>document officiel<\/strong> mentionne la <strong>r\u00e9f\u00e9rence au PV de r\u00e9ception de travaux<\/strong>, liste les points lev\u00e9s, pr\u00e9cise les intervenants et les dates, et formalise la fin des d\u00e9sordres signal\u00e9s.<\/p>\n\n\n\n<p>Dans certains chantiers, un quitus de lev\u00e9e des r\u00e9serves peut \u00eatre ajout\u00e9 pour synth\u00e9tiser l\u2019ensemble des corrections valid\u00e9es. Bien qu\u2019il ne soit pas obligatoire, il renforce la tra\u00e7abilit\u00e9.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Acteurs concern\u00e9s<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Le <strong>ma\u00eetre d\u2019ouvrage<\/strong> est responsable de r\u00e9ceptionner et valider les travaux.<br><\/li>\n\n\n\n<li>Le <a href=\"https:\/\/archipad.com\/fr\/maitre-oeuvre\/\"><strong>ma\u00eetre d\u2019\u0153uvre<\/strong><\/a> assure un r\u00f4le de coordination et de contr\u00f4le technique.<br><\/li>\n\n\n\n<li>Les entreprises (et leurs \u00e9ventuels <a href=\"https:\/\/archipad.com\/fr\/comment-mieux-gerer-vos-sous-traitants-grace-au-digital\/\">sous-traitants<\/a>) r\u00e9alisent les reprises n\u00e9cessaires.<\/li>\n<\/ul>\n\n\n\n<p>Le contr\u00f4leur technique peut \u00eatre impliqu\u00e9 pour valider certains points de <a href=\"https:\/\/archipad.com\/fr\/securite-sur-chantier\/\">s\u00e9curit\u00e9<\/a> ou de conformit\u00e9 r\u00e9glementaire.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Mod\u00e8le de PV de lev\u00e9e de r\u00e9serves<\/strong><\/h3>\n\n\n\n<p>Ce mod\u00e8le de proc\u00e8s-verbal vous aide \u00e0 encadrer la lev\u00e9e des r\u00e9serves dans un cadre clair et conforme, y compris lorsque votre r\u00e9ception comprend un jalon formel (de type <a href=\"https:\/\/www.economie.gouv.fr\/daj\/les-formulaires-dexecution-des-marches\" target=\"_blank\" rel=\"noopener\"><strong>EXE 8<\/strong><\/a>). Il est \u00e0 adapter selon les modalit\u00e9s contractuelles de votre chantier.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"362\" height=\"512\" data-id=\"15914\" src=\"https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-un.jpg\" alt=\"\" class=\"wp-image-15914\" srcset=\"https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-un.jpg 362w, https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-un-212x300.jpg 212w\" sizes=\"(max-width: 362px) 100vw, 362px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"362\" height=\"512\" data-id=\"15922\" src=\"https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-2.jpg\" alt=\"\" class=\"wp-image-15922\" srcset=\"https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-2.jpg 362w, https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-2-212x300.jpg 212w\" sizes=\"(max-width: 362px) 100vw, 362px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"362\" height=\"512\" data-id=\"15918\" src=\"https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-3.jpg\" alt=\"\" class=\"wp-image-15918\" srcset=\"https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-3.jpg 362w, https:\/\/archipad.com\/wp-content\/uploads\/2025\/08\/Levee-de-reserve-exemple-3-212x300.jpg 212w\" sizes=\"(max-width: 362px) 100vw, 362px\" \/><\/figure>\n<\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Que faire si les r\u00e9serves ne sont pas lev\u00e9es ?<\/strong><\/h2>\n\n\n\n<p>Il arrive que certaines r\u00e9serves ne soient pas lev\u00e9es dans les <strong>d\u00e9lais fix\u00e9s<\/strong>, soit par n\u00e9gligence, soit \u00e0 cause d\u2019un <strong>cas de d\u00e9saccord<\/strong> sur la conformit\u00e9.<\/p>\n\n\n\n<p>Que faire dans ce cas ?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1.<\/strong> <strong>Lettre de mise en demeure<\/strong><\/h3>\n\n\n\n<p>Le ma\u00eetre d\u2019ouvrage peut adresser une <strong>lettre de mise en demeure<\/strong> \u00e0 l\u2019entreprise pour exiger la lev\u00e9e des r\u00e9serves dans un nouveau d\u00e9lai contractuel (souvent 15 jours suppl\u00e9mentaires).<\/p>\n\n\n\n<p>Cette d\u00e9marche est g\u00e9n\u00e9ralement effectu\u00e9e par lettre recommand\u00e9e afin de s\u00e9curiser la preuve d\u2019envoi.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2.<\/strong> <strong>Intervention d\u2019un tiers<\/strong><\/h3>\n\n\n\n<p>En cas de refus ou d\u2019inaction persistante, les travaux peuvent \u00eatre confi\u00e9s \u00e0 une autre entreprise, <strong>aux <a href=\"https:\/\/archipad.com\/fr\/frais-de-chantier\/\">frais<\/a> de l\u2019entreprise d\u00e9faillante<\/strong>.<\/p>\n\n\n\n<p>Cette solution doit \u00eatre appliqu\u00e9e en respectant les stipulations contractuelles (<a href=\"https:\/\/www.economie.gouv.fr\/daj\/commande-publique\/reglementation-de-la-commande-publique\/cahiers-des-clauses-administratives\" target=\"_blank\" rel=\"noopener\">CCAG<\/a>, normes priv\u00e9es, march\u00e9).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3.<\/strong> <strong>Recours judiciaire<\/strong><\/h3>\n\n\n\n<p>Si aucun accord n\u2019est trouv\u00e9, le ma\u00eetre d\u2019ouvrage peut saisir le <strong>juge des r\u00e9f\u00e9r\u00e9s<\/strong> pour obtenir une ex\u00e9cution forc\u00e9e des r\u00e9parations. Ce recours doit rester exceptionnel, car il allonge les d\u00e9lais et complique la relation contractuelle.<\/p>\n\n\n\n<p>Le juge des r\u00e9f\u00e9r\u00e9s peut ordonner une expertise ou une ex\u00e9cution sous astreinte.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Cl\u00f4ture de chantier : s\u00e9curiser chaque r\u00e9serve lev\u00e9e<\/strong><\/h2>\n\n\n\n<p>La lev\u00e9e de r\u00e9serve n\u2019est pas une simple formalit\u00e9. Elle conditionne la lib\u00e9ration des garanties financi\u00e8res et la fin des engagements contractuels.<\/p>\n\n\n\n<p>Un <strong>quitus de lev\u00e9e de r\u00e9serves<\/strong>, aussi appel\u00e9 PV de lev\u00e9e permet de :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>prouver la r\u00e9solution effective des r\u00e9serves,<br><\/li>\n\n\n\n<li>d\u00e9bloquer la retenue de garantie,<br><\/li>\n\n\n\n<li>pr\u00e9venir toute contestation future.<\/li>\n<\/ul>\n\n\n\n<p>En r\u00e9sum\u00e9, chaque \u00e9tape doit \u00eatre document\u00e9e, dat\u00e9e et valid\u00e9e par les parties.<\/p>\n\n\n\n<p>Conserver l\u2019ensemble des documents (PV de r\u00e9ception, PV de lev\u00e9e, LRAR, \u00e9changes) constitue une protection essentielle en cas de contestation ult\u00e9rieure.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Archipad, un alli\u00e9 pour piloter la lev\u00e9e de r\u00e9serve<\/strong><\/h2>\n\n\n\n<p>Avec l\u2019outil de <a href=\"https:\/\/archipad.com\/fr\/meilleur-logiciel-suivi-de-chantier\/\">suivi de chantier<\/a> Archipad, chaque r\u00e9serve peut \u00eatre :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>enregistr\u00e9e<\/strong> avec pr\u00e9cision sur plan,<br><\/li>\n\n\n\n<li><strong>illustr\u00e9e<\/strong> par des photos ou annotations,<br><\/li>\n\n\n\n<li><strong>suivie<\/strong> \u00e9tape par \u00e9tape par tous les intervenants,<br><\/li>\n\n\n\n<li><strong>cl\u00f4tur\u00e9e<\/strong> d\u00e8s validation.<\/li>\n<\/ul>\n\n\n\n<p>L\u2019ensemble du processus est centralis\u00e9 dans une interface simple et accessible, pour un <strong>gain de temps r\u00e9el<\/strong> et une <strong>tra\u00e7abilit\u00e9 compl\u00e8te<\/strong>, sur le terrain comme au bureau.<\/p>\n\n\n\n<p>L\u2019export structur\u00e9 des listes de r\u00e9serves \u00e9tablies lors des <a href=\"https:\/\/archipad.com\/fr\/fonctionnalites\/opr-gestion-dobservations-levee-de-reserves\/\">OPR<\/a> ou des PV dans Archipad facilite \u00e9galement la r\u00e9daction des documents officiels.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Conclusion<\/strong><\/h2>\n\n\n\n<p>La lev\u00e9e de r\u00e9serve est bien plus qu\u2019un simple point de contr\u00f4le : c\u2019est une phase contractuelle \u00e0 part enti\u00e8re, qui engage la responsabilit\u00e9 des entreprises et s\u00e9curise le projet jusqu\u2019\u00e0 son terme.<\/p>\n\n\n\n<p>En ma\u00eetrisant cette \u00e9tape, en formalisant correctement chaque lev\u00e9e et en utilisant les bons outils, les professionnels du BTP assurent un suivi fluide et une cl\u00f4ture de chantier sans accroc.<\/p>\n\n\n\n<p>Avec <strong>Archipad<\/strong>, la gestion des r\u00e9serves devient claire, collaborative et rigoureusement document\u00e9e. Une solution fiable pour transformer cette \u00e9tape sensible en formalit\u00e9 bien cadr\u00e9e.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>FAQ<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. C&rsquo;est quoi une lev\u00e9e de r\u00e9serve ?<\/strong><\/h3>\n\n\n\n<p>\u2019est la proc\u00e9dure par laquelle le ma\u00eetre d\u2019ouvrage v\u00e9rifie que les d\u00e9fauts ou malfa\u00e7ons signal\u00e9s (r\u00e9serves \u00e9mises) ont bien \u00e9t\u00e9 corrig\u00e9s, et formalise la conformit\u00e9 via un proc\u00e8s verbal.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. Quel est le d\u00e9lai l\u00e9gal de lev\u00e9e de r\u00e9serve ?<\/strong><\/h3>\n\n\n\n<p>Il n\u2019existe aucun d\u00e9lai l\u00e9gal. Le d\u00e9lai pour lever les r\u00e9serves est d\u00e9fini contractuellement dans le proc\u00e8s verbal de r\u00e9ception des travaux. \u00c0 d\u00e9faut, certains textes comme la norme NF P 03-001 indiquent des d\u00e9lais indicatifs, sans valeur obligatoire.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. C&rsquo;est quoi \u00e9mettre des r\u00e9serves ?<\/strong><\/h3>\n\n\n\n<p>\u00c9mettre des r\u00e9serves signifie signaler des <a href=\"https:\/\/archipad.com\/fr\/non-conformite\/\">non-conformit\u00e9s<\/a>, malfa\u00e7ons ou \u00e9l\u00e9ments manquants lors de la r\u00e9ception des travaux, qui seront ensuite \u00e0 corriger dans le cadre de la garantie de parfait ach\u00e8vement.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4. Qu&rsquo;est-ce qu&rsquo;un PV de lev\u00e9e de r\u00e9serve ?<\/strong><\/h3>\n\n\n\n<p>C\u2019est un document officiel \u00e9tabli par le ma\u00eetre d\u2019ouvrage et le ma\u00eetre d\u2019\u0153uvre, attestant que toutes les r\u00e9serves mentionn\u00e9es dans le PV de r\u00e9ception ont \u00e9t\u00e9 corrig\u00e9es.<\/p>\n\n\n\n<p>Il peut, en pratique, servir de base \u00e0 un quitus final.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>5. Quel est le d\u00e9lai l\u00e9gal pour lever les r\u00e9serves ?<\/strong><\/h3>\n\n\n\n<p>Il n\u2019existe pas de d\u00e9lai l\u00e9gal universel. Les d\u00e9lais fix\u00e9s doivent \u00eatre pr\u00e9cis\u00e9s dans les documents contractuels et peuvent faire l\u2019objet d\u2019une n\u00e9gociation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>6. Quel est le synonyme de \u00ab\u00a0\u00e9mettre des r\u00e9serves\u00a0\u00bb ?<\/strong><\/h3>\n\n\n\n<p>On peut utiliser les expressions \u00ab formuler des r\u00e9serves \u00bb ou \u00ab signaler des non-conformit\u00e9s \u00bb.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>7. Qu\u2019est-ce qu\u2019une lev\u00e9e de r\u00e9serves partielle ?<\/strong><\/h3>\n\n\n\n<p>C\u2019est une lev\u00e9e portant seulement sur certaines r\u00e9serves, les autres restant \u00e0 corriger ult\u00e9rieurement.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>8. Que se passe-t-il si de nouveaux d\u00e9sordres apparaissent une fois les r\u00e9serves lev\u00e9es ?<\/strong><\/h3>\n\n\n\n<p>Ils peuvent relever de la <a href=\"https:\/\/archipad.com\/fr\/garantie-biennale\/\">garantie biennale<\/a> ou d\u00e9cennale selon leur nature.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pourquoi la lev\u00e9e de r\u00e9serve est-elle la cl\u00e9 d\u2019une r\u00e9ception r\u00e9ussie ? La r\u00e9ception d\u2019un chantier est un moment charni\u00e8re\u2026 mais pas forc\u00e9ment la fin des ennuis. Travaux incomplets, d\u00e9fauts d\u2019ex\u00e9cution, prestations oubli\u00e9es\u202f: les r\u00e9serves peuvent rallonger les d\u00e9lais et compliquer la relation client-entreprise si elles ne sont pas g\u00e9r\u00e9es avec rigueur. Dans cet article, [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":15926,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jet_sm_ready_style":"","_jet_sm_style":"","_jet_sm_controls_values":"","_jet_sm_fonts_collection":"","_jet_sm_fonts_links":"","footnotes":""},"categories":[178],"tags":[],"class_list":["post-15913","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-conseils-astuces"],"_links":{"self":[{"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/posts\/15913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/comments?post=15913"}],"version-history":[{"count":1,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/posts\/15913\/revisions"}],"predecessor-version":[{"id":16938,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/posts\/15913\/revisions\/16938"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/media\/15926"}],"wp:attachment":[{"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/media?parent=15913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/categories?post=15913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archipad.com\/fr\/wp-json\/wp\/v2\/tags?post=15913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}